Specifications
Section 2. UT10 Tower Installation 
FIGURE 2.1-3. Concrete Foundation and Anchor Bolts 
2.1.2 Tower Installation 
1.  Install the mast as shown in Figure 2.1-4. Attach the 3/4" x 10" nipple to 
the mast using the bell reducer. Loosen the two bolts at the top of the 
tower and insert the mast. For a 3 m mounting height, the bell reducer 
should rest against the top of the tower. Tighten the two bolts to secure 
the mast. 
2.  Remove the three upper bolts on the aluminum sleeves attached to the 
base. Loosen the nuts on the three lower bolts and position the sleeves 
vertically (Figure 2.1-2). 
3.  Stand the tower upright and insert the three legs into the sleeves. Align 
the holes and replace the bolts previously removed. 
4.  Check the tower for plumb using a level and adjust the leveling nuts as 
required. When the tower is plumb, use two wrenches to lock the two 
lower nuts together. Tighten the upper nuts to secure the base. 
5.  The lower bolt in the rear leg can be removed to allow the tower to be 
hinged to the ground. If a step ladder is available, it is easier to leave the 
tower upright. 
2-3 










