Specifications
TEAM Climate Monitoring Protocol 3.1
71 
 Level of gauge checked. Action taken if any:________________________________________________________ 
 Sensor cable checked. Action taken if any:_________________________________________________________
 Debris removed (explain):______________________________________________________________________
 Exterior surface condition checked (explain):____________________Action taken:__________________________
Is Fan operational? Yes. Fan Speed:_________ No. Action taken:___________________________________
 Condition of Sensor cable checked (explain):____________________Action taken:_________________________ 
 Condition of Power cable checked (explain):_____________________Action taken:_________________________
Climate Monitoring Protocol
Climate Maintenance Log
v. 1.1
Page 2/2
 Sensor tip condition checked (explain):____________
_____________________________________________
Action taken:___________________________________
 Cable from sensor- condition checked (explain):
_____________________________________________
Action taken:___________________________________
Climate Station ID
FIRST NAME
LAST NAME
Name of Person recording this information
CL
PointSite Code
SECTION 5: TEMPERATURE/RH (every month)
DDMMYYYYDate of inspection:
Sensor 1. Serial Number:
 Sensor tip condition checked (explain):____________
_____________________________________________
Action taken:___________________________________
 Cable from sensor- condition checked (explain):
_____________________________________________
Action taken:___________________________________
Sensor 2. Serial Number:
Aspirated Radiation Shield (every two weeks)
SECTION 6: SOLAR RADIATION (every month)
Sensor 1. Serial Number:
Sensor 2. Serial Number:
 Sensor level checked 
 Sensor cable checked.
Action taken if any:___________________________
 Sensor surface checked
Action taken if any:___________________________
 Sensor level checked 
 Sensor cable checked.
Action taken if any:___________________________
 Sensor surface checked
Action taken if any:___________________________
SECTION 7: PRECIPITATION (every two weeks)
Serial Number:










