Specifications
Section 2. Hardware Installation
2.4.7 Pyranometer
Level the pyranometer as indicated in Figure 2.4-12. Adjust the three leveling
screws until the bubble level indicates plumb. Remove the red or green
shipping cap from the pyranometer. See Figure 2.4-13.
Leveling
Screws
FIGURE 2.4-12. Pyranometer Leveling
Remove Cap
FIGURE 2.4-13. Remove Red or Green Pyranometer Cap
2-18