Specifications
Section 1. Preparation and Siting
Top Layer
Instruction
Manual
Cardboard
Manual
Wind Vane
Crossarm with Rain, Solar, and
Temp/%RH Sensors
Enclosure
Wind Set
Instruction
Manual
FIGURE 1.2-2. ET107 with the Met One 034B-ETM Wind Sensor, Top Layer
Cardboard
Containing Wind Vane
301-T
Bottom Layer
BATTERY
DESI PAK
FIGURE 1.2-3. ET107, Bottom Layer
⇒ Securely tape box shut if transporting entire station to another site. If
at the main site, remove any communication components that are
installed at the calling computer. Repackage remaining components
for transport to field site.
Solar panel and RF items (if any) will be packed in a separate box.
Mounting Template Grounding Wire
and Enclosure Desiccant Packs
2-Piece Pole Grounding and
Lightning Rod
AC Transformer
and Cabling
Mounting Bolts
and Hardware
Enclosure
Battery
PVC Swept
Elbow Conduit
Communication
Option Cabling
Temp/%RH
Gill Radiation
Shield
1-4