Instruction manual

WS-PRO2 Weather Station Manual
GT
27176
Page 59 of 61
Material Authorization number or contact Campbell Scientific for
gasket cost to replace gasket in the field.
4-5 years
Check all cabling for sensors, communication, and power. Replace
as required.
Check enclosure relative humidity sensor (item# 10070). To check
this sensor take the lid off the enclosure during routine desiccant
replacement and leave it off for 5 – 10 minutes before putting in
new desiccant. While the lid is off the enclosure compare the
internal enclosure humidity to the air humidity. Replace if > 10% off.
General Maintenance
An occasional cleaning of the glass on the solar panel will imrove
its efficiency. Use warm mildly soapy water and a clean cloth. Rinse
with clean water.
Check sensor leads and cable for cracking, deterioration, proper
routing, and strain relief.
Check the tower for structural damage, proper alignment, and for
level/plumb.
7.2.0 Troubleshooting
7.2.1 No Response Using the CR10KD Keypad
Check keypad response after each of the following steps.
Make sure the battery has been installed and the power
switch set to “ON” (section 3.1.1 – 3.1.3).
Use a voltmeter to measure the voltage on the 12 V and G
terminals (see Figure 17); the voltage must be between 9.6
and 16 VDC.
Use a voltmeter to measure the voltage on the 5V and G
terminals (see Figure 17); the voltage must be between 4.9 –
5.1 VDC.
Disconnect the temp/RH sensor from the back of the
enclosure.
Disconnect the 9-pin ribbon cable from any communication
option used with the station so that only the keypad is
attached to the 9-pin plug in the lower right hand corner of
the enclosure.
Cycle the power to the datalogger by switching the power
supply to “OFF”, then to “ON” or disconnecting and