User guide

SAA CR Logger Integration Guide
May 2012 20
LoggerNet Task Master’ utility. The first manual conversion is necessary to generate the pref_project.txt
file which contains conversion settings for subsequent operations.
The procedure for automating the data conversion process is:
a) Disable scheduled data collection in the LoggerNet ‘Setup utility
b) Send program files (both main and SAA_Include) to the CR1000
c) Set the path for data files in the LoggerNet Setup utility
d) Manually download the data from the logger and perform a manual conversion. This will
generate the required pref_project.txt file.
e) Setup a new task using the Task Master utility (subsequently described)
f) Manually download the data again.
g) Enable scheduled data collection at the desired data collection interval.
If you do not follow this procedure you run the risk of having data gaps.
To add a task in the Task Master, click on the CR1000 of interest, and click the ‘Add After’ button. Under
‘How Task_n Starts’, in the Station Event Type, select the ‘After Successful Call’ Option (Figure 13.1).
Figure 13.1: Creating a task using the LoggerNet 'Task Master' Utility.