User`s guide

Call-Back Configuration for the CR800/CR1000 – MultiLogger Application Note #19 – Page 10 of 12
Configure the Task Name as appropriate to help identify the Task. Use the file open button to browse
to the executable to run, in this case Roobrik. Enclose the executable in quotes when using command
line parameters, the parameters direct Roobrik to load the mychart parameter file, then GO! and Quit.
See the Roobrik User’s Guide section 2.3 for more information on the Roobrik command line parameters.
Optionally additional tasks can be configured and selected using the After Task Do drop-down.
Configured tasks will display in the drop-down. Use the Run this task after collect data for this
gateway to run the Task after a scheduled data collection.
Next, configure the logger node to execute the Task. Select the logger node in the Network Configuration
and use the After Call-back Do drop-down to select the task. You may also select other logger nodes for
data collection to automate data collection from other loggers in the event of call-back from one logger.
See the following section on starting the Agent to handle the call-back events.