Owner's manual
Table Of Contents
- Revision and Copyright Information
- Limited Warranty
- Assistance
- Table of Contents
- 1. Preparation and Siting
- 2. Hardware Installation
- 2.1 Base Foundation
- 2.2 Tower/Pole
- 2.3 Enclosure
- 2.4 Crossarm and Sensor Installation
- 2.5 Communication Peripherals
- 2.6 Lightning Rod Installation
- 2.7 Solar Panel Installation
- 2.8 Battery Installation
- 2.9 Restraining Cables and Sealing/Desiccating Enclosure
- 3. ET Software
- 4. Maintenance, Troubleshooting, and Schematics
- 4.1 Maintenance
- 4.2 Troubleshooting
- 4.2.1 No Response Using the CR1000KD Keypad
- 4.2.2 No Response from Datalogger through SC32B, RAD Modem, or Phone Modem
- 4.2.3 NAN or (INF Displayed in a Variable
- 4.2.4 Unreasonable Results Displayed in a Variable
- 4.2.5 NAN or (INF Stored in a Data Table
- 4.2.6 Communication Problems when using an RF450 Radio
- 4.2.7 Gill WindSonic1-ET Diagnostic Diagnostic Codes
- 4.3 Schematics of Connectors
- Appendix A. T107 Maintenance Log
- Appendix B. PS24 24 Ahr Power Supply and 10 x 12 inch Enclosure
- Appendix C. Exploded Views
- Appendix D. Default Programs
- Appendix E. Step-down Transformer Installation
- Campbell Scientific Companies

T107 Weather Station
2.3 Enclosure
The weather station datalogger, power supply, sensor connection panel,
communications devices, and data retrieval peripherals are mounted in the ET
enclosure. Refer to Appendix C.1, Enclosure, for a labeled, exploded view of
the enclosure.
FIGURE 2-6. T107 Instrumentation Mounted on the ET Tower
2.3.1 Enclosure Installation
1. Mount the ET enclosure on the ET Tower as shown in FIGURE 2-7.
a. Remove the front lid. Remove the connector cover from the back of
the ET enclosure by loosening the Phillips screw at the bottom of the
cover.
b. Loosen the mounting bracket bolts on the back of the enclosure wide
enough to slide over the pole. Slide the enclosure over the pole.
Position the enclosure so it faces east for northern latitudes or west
for southern latitudes. The top of the enclosure should be 2 – 2.5 cm
(3/4 to 1 in) above the top of the pole (see FIGURE 2-7).
ET Enclosure
Tipping Bucket
Rain Gage
Pyranometer
Crossarm
Met One 034B
Wind Set
Radiation
Shield
Lightning
Rod
Ground
Rod
16










