User guide
Appendix B. Tube Installation
Insert the EasyAG
TM
dolly into the top cap and position it on top of the internal
access tube.
Continue inserting the probe using a sledgehammer until there is a 2.5 cm (1
inch) gap between the base of the top cap and the edge of the stabilization
brace tube guide.
A 2.5 cm clearance height is important.
NOTE
B-9










