Operating Guide
M4 X 10 SCREW (2)
HOPPER LID (1)
HOPPER GUARD (1)
FIG. 6
HOPPER LID (1)
M4 X 10 SCREW (2)
HOPPER GUARD (1)
HOPPER ASSEMBLY
1. Assemble burner pullout as shown by sliding the rod
through the bottom hole on the right side of the grill as
shown in Fig. 7. Burner pullout plate should be centered
over the hole in the bottom of the stove and centered
between the guides.
PULLOUT KNOB (3)
PG24-9
PG36 BURNER PULLOUT (1)
PG36-8
HAIRPIN
STOP LOCK BUSHING (1)
PG24-76
FIG. 7
2. Assemble hairpin through hole in burner pullout rod to
prevent the pullout from pulling out too far.
3. Assemble the stop lock bushing on the burner pullout rod
as shown in Fig.8. Make sure that the larger side of the
bushing is towards the grill.
4. Install pullout knob onto burner pullout and tighten
against the stop lock bushing.
DETAIL A
PG36 BURNER PULLOUT (1)
PG36-8
HAIRPIN
SEE DETAIL A
PULLOUT KNOB (3)
PG24-9
STOP LOCK BUSHING (1)
PG24-76
FIG. 8
5. Install the feed gasket over the hopper tube. Install the
hopper tube through the square opening on the side
of the grill assembly. When the hopper tube is about
half way in, route the thermometer through the upper
rectangular hole as shown in Fig. 9. Note: Be careful not
to damage the thermometer.
FEED GASKET (1)
PG24-34
THERMOMETER (1)
PG24-44
HOPPER TUBE
ROUTE THERMOMETER
THROUGH THIS HOLE
FIG. 9
6. Attach hopper assembly using Qty (4) M6 x 15 bolts as
shown in Fig. 10.
7. Install thermometer as shown then secure using Qty (2) ST
4.2 x 10 screws as shown in Fig. 10
8. Push extra wire from thermometer back through the hole
to the hopper. Install probe cover to the wall where the
thermometer came thru the wall using QTY (2) ST 4.2 x 10
screws. Make sure that the notch in the cover is up and wire
goes through notch so it is not pinched.
9. Secure hopper end to the grill body assembly using Qty (2)
ST 4.2 x 10 screws as shown in Fig. 10
PG36 BURNER PULLOUT (1)
PG36-8
THERMOMETER (1)
PG24-44
HOPPER ASM (1)
PG24CL-2
COVER PLATE (1)
PG36SGX0-1
ST4.2 X 10 SCREW (6)
M6 X 15 BOLT (9)
HOPPER END
FIG. 10
INSTALL SHELF BRACKETS
1. Install the brackets as shown in Fig 11.
2. Tighten all hardware.
UPPER GRATE BRACKET (2)
PG24SG-11
M6 X 15 SCREW (4)
M6 FLANGE NUT (4)
FIG. 11
INSTALL SHELF
(Optional-Do not install if installing sear box)
1. Install shelf as shown in Fig 5.
2. Tighten all hardware
M6 HANDLE SCREW (2)
HANDLE DEFLECTOR
HANDLE
HANDLE BEZEL (2)
GREASE BUCKET
M6 X 15 SCREW
ASH CUP
FIG. 5