AUTOMATION FOR SLIDING GATES BK INSTALLATION MANUAL BK 800 - 1200 - 1800 - 2200 BKE 1200 - 1800 - 2200
“IMPORTANT SAFETY INSTRUCTIONS FOR INSTALLATION” “CAUTION: IMPROPER INSTALLATION MAY CAUSE SERIOUS DAMAGE, FOLLOW ALL INSTALLATION INSTRUCTIONS CAREFULLY” “THIS MANUAL IS ONLY FOR PROFESSIONAL INSTALLERS OR QUALIFIED PERSONS” 1 Legend ENGLISH This symbol indicates sections to be read with particular care. This symbol indicates sections concernig safety This symbol indicates notes to communicate to users.
4.
5 Installation Only expert, qualified personnel must carry out the installation, in full compliance with the applicable law.
12345- 67891011- Key-operated selector switch Flashing light indicating door movement Antenna Safety photocells Photocell column Closure stop ENGLISH BK or BKE unit Control board incorporated Radio receiver Limit-switch tabs (only for the BK unit) Rack 5.
5.5 Unit installation ENGLISH During the initial phase of installation, the feet should protrude by 5-10 mm. in order to allow for alignment, anchorage of the rack and further adjustments. Perfect alignment with the guide rail is made possible by the (paten-ted) built-in regulation system, which consists of: - slots for horizontal adjustment; - threaded steel feet for vertical adjustment and levelling; - plates and bolts for anchorage to the base. 5÷10 mm.
5.7 Attaching the switch tabs (BK series) Position the limit-switch tabs (whose positions determine the limits of gate travel) on the rack. Note: do not allow the gate to strike the mechanical stops in the open or closed positions. All the data and information contained herein is considered subject to change at any time and at our discretion ENGLISH #!-% #!-% 5.8 Manual release of the gearmotor To open the access door, insert the key A, push down and rotate clockwise.
6 Control board ENGLISH The control board is powered with (120V a.c. or 230V a.c.) across terminals L and N and is protected by fuse on the main power line (see table). The control systems are powered by low voltage (24V) and protected by a 1A fuse. The total power consumption of the 24V accessories must not exceed 20W. The operating time (interval) is fixed at 150 seconds.
6.3 Electrical connections Connection for gear motor, limit switch or encoder 5 RED 7 % %8 (Condenser) Connection for the limit switch unit (BK series) COM NO NC COM NC Output for 230V (a.c.
Connections to the systems 0 -/4 ENGLISH 43 Key selector and/or opening button (N.0. contact) – Opens the gate leaf. Key selector and/or partial opening button (N.0. contact) - Opens the gate leaf for pedestrian access (adjustable using the trimmer PAR.OP.) Key selector and/or closing button (N.0. contact) – Closes the gate leaf. Key selector and/or commands button (N.0.
Connections to safety devices (DIR photocell) 6 43 0 #8 # -/4 ENGLISH 6 6 6 48 # .# All the data and information contained herein is considered subject to change at any time and at our discretion Set power supply to 24V a.c./d.c. RX (N.C.) contact for “re-opening during closing” – Input for safety devices such as photocells, sensitive safety edges and other devices compliant with EN 12978 standards.
6.4 Electrical connection for the check of the operating state of the photocells $)2 48 # .# 43 0 48 48 -/4 43 0 -/4 Each time an open or close command is given, the circuit board checks the efficiency of the safety devices (i.e. photocells). The flashing led indicator on the control panel indicates an anomaly of the photocells (Ref. to point 9, p. 8), consequently it cuts off any command from the remote control or push button.
6.7 Selecting functions (dip-switch) ON OFF ON 1 2 3 4 5 6 7 8 9 10 ON 11 12 13 14 15 16 17 18 19 20 2 ON - ENGLISH 1 ON - Automatic Closing – the automatic closing timer is automatically triggered at the end of the opening phase. The adjustable set time of operation, is in any case subordinate to the operation of any safety accessories and is excluded after a total “stop” phase or if the main power is cut off.
7 Programming of limit switches for ZBKE board 1) Close the engage door-panel and insert DIP switch 15 to the ON position, the led indicator of the radio code starts flashing. /. 2) Manually close the gate leaf, press the “CLOSE” button, the led indicator keeps flashing as long as button is kept pressed. 3) Manually open the gate leaf, press the “OPEN” button, the led code indicator keeps flashing as long as the button is kept pressed. N.B.
8 Connection of two coupled gear motors with single control 1) Coordinate the direction of gear motors “A” and “B”, by changing the rotation of motor “B” (see connection for the gear motor and limit switches, p. 9). /. All the data and information contained herein is considered subject to change at any time and at our discretion 2) Establish which motor, “A” or “B” will be the master (or pilot), set dip switch 14 to the ON on position on the control board.
9 Installation procedure of the transmitter for remote control ENGLISH " " Read the three steps below before beginning installation procedures: - prepare the radio board (paragraph 9.1); - procedure for codifying the transmitter (paragraph 9.2); - memorizing the code on the command board (paragraph 9.3). 9.1 Prepare the radio board AF 1) On AM transmitters operating at 433.92 MHz (TOP and TAM series), position the jumper connection on circuit card AF43S as shown on the sheet.
9.2 Procedure for codifying the transmitter TOP SERIES D 0 ENGLISH TOP T432M - T312M 0 set the code to dip-switch C and channel to D (P1=CH1 and P2=CH2, default setting) All the data and information contained herein is considered subject to change at any time and at our discretion P1 /. 0 0 0 0 set code only /. CH2 CH4 /. CH3 /. CH1 TOP T434M - T314M CH2 /. P2 /.
TOP QUARTZ SERIES Standard encoding procedure T262M - T264M - T2622M - T302M - T304M - T3022M ENGLISH 1 assign a code (also on file) 0 /&& 0 /. Press P1 or P2 in sequence in order to register the code; at the tenth pulse, a double beep will confirm that registration has occurred 3 register code 4 disinserire jumper J 0 TOP T262M - T302M 0 The first encoding operation must be carried out whilst keeping the jumpers positioned for channels 1 and 2 as per fig. A; see fig.
T2622M - T3022M T264M - T304M P1 = CH1 0 1° Code 0 0 P1 = CH1 ENGLISH P2 = CH2 0 P2 = CH2 P3 = CH3 All the data and information contained herein is considered subject to change at any time and at our discretion P4 = CH4 0 0 0 0 0 /&& 0 /.
9.3 Memorizing the code on the command board ENGLISH CH1 = Channel for direct commands to a function of the ratiomotor control unit (“open only” / “open-close-invert direction” commands or the “open-stop-close-stop” command, depending on dip-switch 2 - 3 settings). AF CH1 Flashing LED 2) Press a transmitter key to send the code; the LED will remain lighted to signal memorization.
10 Maintenance 10.1 Periodic maintenance The unit does not require specific maintenance. Only as a precautionary measure and in case of intensive use, it is opportune to periodically (every six months) check that the electric cables are in good condition and that the bolts and nuts are tight, and oil the contact areas between the fixed and mobile sliding pieces. All checks must be recorded (in a dedicated record-book).
CAME UNITED KINGDOM LTD UNIT 3, ORCHARD BUSINESS PARK TOWN STREET, SANDIACRE NOTTINGHAM - NG10 5BP - U.K. Tel 0044 115 9210430 Cod. 119BS04 ver. 4.