User Manual

Pag.
14
14 - Manual code:
119DU85
119DU85 ver.
0.1
0.1 01/2009 © CAME cancelli automatici s.p.a. - The data and information reported in this installation manual are susceptible to change at any time and without obligation on CAME cancelli automatici s.p.a. to notify users.
ENGLISH
7.3 Extra-ordinary maintenance
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed _______________________________________________________________________________________
__________________________________________________________________________________________________
____________________________________________________________________________________________
The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specialised firms.
N.B.: Any extraordinary maintenance must be performed by specialised technicians.
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed _______________________________________________________________________________________
__________________________________________________________________________________________________
____________________________________________________________________________________________
Installer’s stamp Operator name
Date of job
Technician’s signature
Requester’s signature
Job performed _______________________________________________________________________________________
__________________________________________________________________________________________________
____________________________________________________________________________________________
Extra-ordinary maintenance log
Date Notes
Signature
Periodic maintenance log for end-user (every 6 moths).