Owner's manual
5
The data and information shown in this manual may be changed by CAME cancelli automatici s.p.a. at any time without prior warning.
ENGLISH
Warning: after establishing the best point to which you will secure the gate bracket, secure the bracket to the pillar and make sure
the quotas shown in the table below are met.
Note: by increasing measure B, the opening angle and gate speed are reduced, while the gearmotor thrust is increased. By
increasing the measure A, the opening angle and gate speed are increases, while the gearmotor thrust is decreased.
Opening
A
(mm)
B
(mm)
C
(mm)
90° 130 130 60
120° 130 110 50
Ideal securing
point
Gate bracketPillar bracket
Lay the corrugated tubing needed for the connections deriving from the junction box.
N.B. the number of tubes depends on the type of system and accessories employed.
The following illustrations are only examples, given that the space available for anchoring the operator and accessories
may vary from gate to gate. It is up to the installer, thus, to choose the most suitable solution.
5.5 Installing the operator
Electric cable junction box