User Manual
Table Of Contents
- Cambium
- PMP 450 Planning Guide
- Accuracy
- Copyrights
- Restrictions
- License Agreements
- High Risk Materials
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This Planning Guide
- PMP support website: http://www.cambiumnetworks.com/support
- Cambium main website: http://www.cambiumnetworks.com/
- Sales enquiries: solutions@cambiumnetworks.com
- Email support: support@cambiumnetworks.com
- Cambium Networks
- 3800 Golf Road, Suite 360
- Rolling Meadows, IL 60008
- Chapter 1: Product description
- Chapter 2: Planning considerations
- Regulatory planning
- Network migration planning
- Site planning
- Link planning
- Analyzing the RF Environment
- Selecting Sites for Network Elements
- Diagramming Network Layouts
- Grounding and lightning protection
- Configuration options for TDD synchronization
- Data network planning
- Security planning
- Isolating APs from the Internet
- Managing module access by passwords
- Filtering protocols and ports
- Port Lockdown
- Isolating SMs
- Filtering management through Ethernet
- Allowing management from only specified IP addresses
- Configuring management IP by DHCP
- Planning for airlink security
- Planning for RF Telnet Access Control
- Planning for RADIUS integration
- Planning for SNMP security
- Ordering components
- Chapter 3: Legal information
- Cambium Networks end user license agreement
- Acceptance of this agreement
- Definitions
- Grant of license
- Conditions of use
- Title and restrictions
- Confidentiality
- Right to use Cambium’s name
- Transfer
- Updates
- Maintenance
- Disclaimer
- Limitation of liability
- U.S. government
- Term of license
- Governing law
- Assignment
- Survival of provisions
- Entire agreement
- Third party software
- Hardware warranty
- Limit of liability
- Cambium Networks end user license agreement
- Chapter 4: Reference information
Network migration planning Planning considerations
2-8
pmp-0047 (December 2012)
Deployment scenario 1 migration procedure
This procedure assumes that there are no temporary frequencies available and that the PMP 450 APs will replace
the existing APs.
Procedure 1a Deployment scenario 1 migration procedure
1
Identify proximity to potential system interferers by running a spectrum analysis scan where the PMP
450 equipment will be deployed. It is recommended to run this scan at several different times of day
and night
2
Record relevant AP and SM configuration parameters within the current operating network, if
applicable, including:
• authentication, and authorization parameters
• frequency configuration
• data network configuration
• RF statistics
• security configuration
3
Configure the PMP 450 AP and SMs for deployment
4
Install the PMP 450 AP
5
Install the PMP 450 MIMO(frequency A) SMs – powered on
6
Verify SM registration, link quality, and link performance.
7
Continue installation for frequency B sector and frequency C sector.