User's Guide
Table Of Contents
- PTP 250 User Guide
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1: Product description
- Chapter 2: Planning considerations
- Chapter 3: Legal information
- Chapter 4: Reference information
- Chapter 5: Installation
- Chapter 6: Configuration and alignment
- Chapter 7: Operation
- Chapter 8: Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance in the ODU cable
- Testing the radio link
- Testing link end hardware
- Glossary
PTP 250 User Guide Ordering components
phn-2182_003v004 (Oct 2011)
UNDER DEVELOPMENT
2-25
Table 2-9 Inventory for ODU and PoE power supply kits
Item Notes
ODUs
ODUs may be Integrated (as illustrated) or
Connectorized.
‘End Complete’ kit contains one ODU with
grounding cable.
‘Link Complete’ kit contains two ODUs with
grounding cables.
PoE power supply
‘End Complete’ kit contains one injector.
‘Link Complete’ kit contains two injectors.