User's Guide

Table Of Contents
Grounding and lightning protection Chapter 2: Planning considerations
2-22
UNDER DEVELOPMENT
phn-2182_003v004 (Oct 2011)
Protection inside a high rise building
The following protection requirements must be observed inside multi-story or high rise
buildings (Figure 2-6):
The drop cable shield must be bonded to the building grounding system at the entry
point to the building.
The drop cable shield must be bonded to the building grounding system at the entry
point to the equipment area.
An LPU must be installed within 600 mm (24 in) of the entry point to the equipment
area.
Figure 2-6 Grounding and lightning protection inside high building