User's Guide

Table Of Contents
PTP 250 User Guide
phn-2182_003v004 (Oct 2011)
UNDER DEVELOPMENT
8-1
Chapter 8: Troubleshooting
This chapter contains procedures for identifying and correcting faults in a PTP 250 link.
These procedures can be performed either on a newly installed link, or on an operational
link if communication is lost, or after a lightning strike.
The following topics are described in this chapter:
Testing link end hardware on
page 8-2 describes how to test the link end hardware,
either when it fails on startup, or after a lightning strike.
Testing the radio link on
page 8-12 describes how to test the link when there is no
radio communication, or when it is unreliable, or when the data throughput rate is too
low