User's Guide
Table Of Contents
- PTP 250 User Guide
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1: Product description
- Chapter 2: Planning considerations
- Chapter 3: Legal information
- Chapter 4: Reference information
- Chapter 5: Installation
- Chapter 6: Configuration and alignment
- Chapter 7: Operation
- Chapter 8: Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance in the ODU cable
- Testing the radio link
- Testing link end hardware
- Glossary
Installing the PoE power supply Chapter 5: Installation
5-30
UNDER DEVELOPMENT
phn-2182_003v004 (Oct 2011)
Mounting the PoE power supply
To mount the PTP 250 PoE power supply: install two screws (Table 5-1) in the wall or shelf,
then align the mounting slots (Figure 5-9) to
capture the surface screws.
Figure 5-9 Mounting slots on underside of PoE power supply
Table 5-1 Screw dimensions for the PoE power supply