User's Guide

Table Of Contents
PTP 250 User Guide Installing the drop cable and LPU
phn-2182_003v004 (Oct 2011)
UNDER DEVELOPMENT
5-27
Installing and grounding the drop cable at building entry
Perform this procedure to install and ground the drop cable and LPU at the building (or
cabinet) entry point (Figure 5-8).
Figu
re 5-8 Grounding at building entry