User's Guide

Table Of Contents
PTP 250 User Guide Installing the drop cable and LPU
phn-2182_003v004 (Oct 2011)
UNDER DEVELOPMENT
5-19
Figure 5-7 Drop cable with RJ45 and gland
Installing and grounding the main drop cable
Perform this procedure to install the main drop cable, connect it to the ODU, and ground it
to the supporting structure.
To install and ground the main drop cable, proceed as follows:
1
Hoist the main drop cable up to the ODU using the hoisting grip and a hoist line.
When the cable is in position and the grip handle is fastened to the supporting
structure, remove the hoist line.
2
Connect the top end of the long drop cable to the ODU (PoE port), as described in
Connecting an RJ45 and gland to a unit on pa
ge 5-20.
3
Lay the main drop cable as far as the building entry point, ensuring there is
enough length to extend through the wall of the building to the LPU.
4
Attach the main drop cable to the supporting structure using site approved
methods.
5
Ground the drop cable to the supporting structure at the points shown in Figure
2-3 (mast or tower inst
allation) or Figure 2-4 (wa
ll installation), as described in
Making a drop cable ground point on
page 5-23.
A mast or tower may require additional grounding points, as specified in
Protection requirements for a mast or tower installation on page 2-18.