User's Guide
Table Of Contents
- PTP 250 User Guide
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1: Product description
- Chapter 2: Planning considerations
- Chapter 3: Legal information
- Chapter 4: Reference information
- Chapter 5: Installation
- Chapter 6: Configuration and alignment
- Chapter 7: Operation
- Chapter 8: Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance in the ODU cable
- Testing the radio link
- Testing link end hardware
- Glossary
PTP 250 User Guide
phn-2182_003v004 (Oct 2011)
UNDER DEVELOPMENT
5-1
Chapter 5: Installation
This chapter describes how to install the PTP 250 hardware,
To install the equipment at each PTP 250 link end, perform these tasks:
• Preparing for installation on
page 5-2 describes the checks to be performed before
proceeding with the installation.
• Installing the ODU on
page 5-4 describes how to install the ODU (integrated or
connectorized) on the supporting structure.
• Installing connectorized antennas on page 5-8 des
cribes how to install separate
antenna(s) (only required for connectorized ODUs).
• Installing the drop cable and LPU on page 5-15 des
cribes how to install the drop cable
from the ODU to the LPU and PoE power supply, and to provide grounding for the
installation.
• Installing the PoE power supply on
page 5-29 describes how to install the PoE power
supply and connect it to the ODU and network cables.