User's Manual

Table Of Contents
Grounding and lightning protection Chapter 2 Planning considerations
phn-2182_002v000
2-18
May 2011
Protection inside a high rise building
The following protection requirements must be observed inside multi-story or high rise
buildings (Figure 2-6):
The drop cable shield must be bonded to the building grounding system at the
entry point to the building.
The drop cable shield must be bonded to the building grounding system at the
entry point to the equipment area.
An LPU must be installed within 600 mm (24 in) of the entry point to the
equipment area.
Figure 2-6 Grounding and lightning protection inside high building