User's Manual
Table Of Contents
- PTP 250 User Guide
- Copyrights
- Safety and regulatory information
- Contents
- List of Figures
- List of Tables
- About This User Guide
- Chapter 1 Product description
- Chapter 2 Planning considerations
- Chapter 3 Legal information
- Chapter 4 Reference information
- Chapter 5 Installation
- Chapter 6 Configuration and alignment
- Chapter 7 Operation
- Chapter 8 Troubleshooting
- Testing link end hardware
- Testing when PoE LEDs do not illuminate correctly
- Testing after a lightning strike
- Test flowcharts
- AC LED is off
- AC LED is flashing
- PORT LED is off
- PORT LED is flashing
- Test Ethernet packet errors reported by ODU
- Test Ethernet packet errors reported by managed switch or router
- Test ping packet loss
- Test resistance at the PoE end of the drop cable
- Testing the radio link
- Testing link end hardware
- Glossary
Grounding and lightning protection Chapter 2 Planning considerations
phn-2182_002v000
2-16
May 2011
Protection requirements for a wall installation
If the ODU is to be mounted on the wall of a building, then in addition to the general
protection requirements (above), the following requirements must be observed:
• The equipment must be lower than the top of the building or its lightning air
terminal.
• The building must be correctly grounded.
A schematic example of a wall installation is shown in Figure 2-4.
Figu
re 2-4 Grounding and lightning protection on wall