User's Manual

Table Of Contents
Aligning antennas Chapter 6 Configuration and alignment
phn-2182_002v000
6-24
May 2011
Aligning antennas
Before performing this task, check that hardware installation is complete (apart from
the network connections) at both the Master and Slave sites.
This task consists of the following procedures:
Starting up the units on pa
ge 6-24
Checking that the units are armed on page 6-25
Aligning antennas on p
age 6-25
Aligning separate antenna
s for spatial diversity on page 6-27
Monitoring received signal level on
page 6-27.
Disarming the units on
page 6-30
Starting up the units
To connect one of the units to a management PC and start up both units, proceed as
follows:
1
Select the unit from which this process is to be controlled; either Master
or Slave. This is the ‘local’ unit.
2
Check that the management PC is connected to the local unit, powered up
and logged on.
3
Start the local unit.
4
Start the remote unit.
5
Log into the local unit as described in Logging into the web interface on
pag
e 6-6.