User Manual

Installation
46
7 Installation
Motorola recommends that only qualified personnel undertake the installation of a PTP 500 Series
Bridge solution.
7.1 Preparation
Before proceeding with the installation you should:
Check the contents of all packages against the parts lists shown in the packing list.
Ensure that you have the correct tools for the job.
Ensure that you are qualified to undertake the work.
Ensure that you have taken the correct safety precautions.
Have completed the site planning as described in Section 6 “Site Planning”.
7.2 Installation Procedure
The 500 Series installation procedure consists of the following steps:
Mounting the ODUs, Section 7.6 “Mounting the ODUs”
Connecting up, Section 7.7 “Connecting Up”
Mounting the PIDU Plus Units, Section 7.7.9 “Mounting the PTP 500 Series Bridge PIDU
Plus”
Mounting the Lightning Protection Units, Section 7.7.5 “Fitting a Lightning Protection Unit”.
Powering Up, Section 7.7.10 “Powering Up”
Aligning the ODUs, Section 7.7.11 “Aligning the PTP 500 Series Bridge ODUs”
7.3 Tools Required
The following specific tools are required to install a PTP 500 Series Bridge in addition to general
tools:
13mm Spanner / Wrench
RJ45 Crimp Tool
IBM Compatible Personal Computer (PC) running Windows 98 or later with 10, 100 or
1000BaseT Ethernet (Ability to change IP settings easily is recommended)
Either Internet Explorer version 6 or higher, or FireFox 1.5 or higher are recommended.
Ethernet patch cable
7.4 Installation Support
Online installation support and contact details for your regional support can be found at
http://www.motorola.com/ptp. A Frequently Asked Questions (FAQ) section can be found
in Section 18 “FAQs”.