User's Manual

Table Of Contents
15 E1/T1 Installation Guide
286
15.2 Making the Connection at the ODU
Looking at the back of the unit with the cable entry at the bottom, the PTP 600 Series Bridge
E1/T1 connection is the first hole on the left (Figure 161) and is labeled E1/T1.
Figure 161
- PIDU Plus and E1-T1 Connexion
The following procedure describes how connection is made at the ODU. It is often easier to
carry out this procedure on the ground or a suitable surface prior to mounting the ODU.
Ensure no power is connected to the PIDU Plus.