User's Manual

Table Of Contents
7 Installation
108
Figure 39 - ODU Mounted on Pole
3. Adjust the elevation and azimuth of the unit before tightening to the required torque
settings of 14 Nm (11 lb ft) for both bolts.
CAUTION: Attach the free end of one earth bonding lead (large tag M10) to the tower metal
work. On no account must this be attached to the mounting bracket bolts.
The enclosure and mounting brackets of the PTP 600 Series Bridge product range are
capable of withstanding wind speeds up to 151mph (242kph). The installer should ensure that
the structure the bridge is fixed to is also capable of withstanding the prevalent wind speeds
and loads. See Section 12 “Wind Loading”.