User's Manual

Table Of Contents
7 Installation
104
7 Installation
IMPORTANT Motorola recommends that only qualified personnel undertake the installation of
a PTP 600 Series Bridge solution.
We recommend that the practices and procedures detailed in the Motorola manual R56
"STANDARDS AND GUIDELINES FOR COMMUNICATION SITES" (68P81089E50) be
applied to all new site build activities. This manual is provided on the PTP 600 CD-ROM.
7.1 Preparation
Before proceeding with the installation you should:
Check the contents of all packages against the parts lists shown in the packing list.
Ensure that you have the correct tools for the job.
Ensure that you are qualified to undertake the work.
Ensure that you have taken the correct safety precautions.
Have completed the site planning as described in Section 6 “Site Planning”.
7.2 Installation Procedure
The 600 Series installation procedure consists of the following steps:
Mounting the ODUs, Section 7.6 “Mounting the ODU
s
Connecting up, Section 7.7 “Connecting Up”
Mounting the PIDU Plus units, Section 7.7.9 “Mounting the PTP 600 Series Bridge PIDU
Plus
Mounting the Lightning Protection Units, Section 10.2 “Detailed Installation”.
Mounting the GPS Sync Unit (if required), Section 14 “TDD Synchronization
Config
uration and Installation Guide” and refer to the “GPS Sync Unit Kit” User Manual
available in your installation CD for specific information related to the GPS Sync Unit.
Powering Up, Section 7.7.10 “Powering Up”.
Establishing a radio link between the two ODUs and aligning the units for the best signal
strength, Section 7.8 “Establishing a Radio Link”.