User manual
User Manual – Rev B FCS Series II
6. Calibration
T tine Calibration sho ed ths. Calib
required if a related assembly is replaced or if th calibrat successf
Calibration of the FCS system can be performed e front pan er the bus
section covers calibration from the front panel.
6.1 Recommended Calibration Equipment
he Rou uld be perform every 12 mon Non-routine ration is only
e periodic
from th
ion is un
el or ov
ul.
. This
Digital Multimeter: 8506A or e ent / better
01A or e t / better
100 mOhm Current Shunt: odel -0.1. 0.25%
10 mOhm Current Shunt: Model RUG-Z-R010-0.1.calibrated to 0.25%
ingle-phase or multi-chassis FCS configurations, a
Load Bank:
be needed. (E.g. Avtron) Size of the load bank depends on
model and phase mode. A load is required to perform the
current measurement calibration near full scale. Current
measurement calibration should be done on the lowest
available voltage range.
The accuracy and value of the load resistor is not critical as
long as the current drawn is sufficient to operate the AC Source
in the upper current range (80-100 %). Suggested values of
load bank settings for current measurement calibration
purposes are shown in Table 6-1.
Phase Meter Krohn-Hite Model 6620 or equivalent phase meter (0.01°
resolution, 0.02° accuracy).
Fluke quival .
HP 344
Isotek M
quivalen
RUG-Z-R100
calibrated to - OR -
Isotek
(For s mode
10 mOhm shunt may be needed.
Various high power load resistors or a resistive load bank will
California Instruments 94