TAC 501 Tests
Starting operations are not applicable to AC Utilization Equipment.
601 Tests – Revision F only. TAC
TAC601 Power Failure - One Phase
Condition Duration (s)
A 100 msec 52
B 500 msec 54
C 3 sec 66
D 7 sec 86
TAC 602 Tests – Revision F only.
TAC601 Power Failure – One, Two Phase
Condition Duration (s)
One Phase
A Phase A, 7 sec - 5x 86
B Phase B, 7 sec - 5x 86
C Phase C, 7 sec - 5x 86
D Phase A, 30 min - 1x 1800
E Phase B, 30 min - 1x 1800
F Phase C, 30 min - 1x 1800
Two Phase
G Phase A&B, 7 sec - 5x 86
H Phase B&C, 7 sec - 5x 86
I Phase A&B, 30 min - 1x 1800
J Phase B&C, 30 min - 1x 1800
TAC 603 Tests – Revision F.
TAC603 Power Failure – Phase Reversal
Condition Duration (s)
A Phase rotation C-B-A 1800
Phase rotation A-B-C 1800