Instruction manual

145
9.6.1.5.NORMAL STATE VOLTAGE MODULATION
DO160[A][B][C] :NORMal state :VOLTage :MODulation <numeric>
This test requires a numeric value equal to the modulation rate in Hz. See Figure 9-2.
The amplitude modulation is calculated based on the modulation rate. This test will last
for 2 minutes.
9.6.1.6.NORMAL STATE FREQUENCY MODULATION
DO160[A][B][C] :NORMal state :FREQency :MODulation <numeric>
This test requires a numeric value equal to the modulation rate in Hz. See Figure 9-3.
The frequency modulation is calculated based on the modulation rate. This test will last
for two minutes.
9.6.1.7.NORMAL STATE POWER INTERRUPT
DO160[A][B][C] :NORMal state :VOLTage :UNDer<numeric>
This test requires a numeric value equal to the test number. There are 15 tests. See Table
1.
9.6.1.8.NORMAL STATE VOLTAGE SURGE
DO160[A][B][C] :NORMAL state :VOLTage :OVER
This test requires a power source with 160 volt output. If the power source has a dual
voltage range, the test will select the high voltage range to complete the test.
The output voltage will remain at 115 volts for 5 minutes before it rises to 160 volts for
30 msec then stay for 5 seconds at 115 volts then drops to 60 volts for 30 msec before
returning to 115 volts for 5 seconds. The above specification with repeat itself three
times.