Instruction manual
127
6. Steady state test
MIL704D[A][B][C] :STEady state
This test will perform all the above five tests in the same order above. A 5 second
pause between tests is asserted.
8.6.2. TRANSIENT
1. Transient high voltage test (Figure 6, page 134).
MIL704D[A][B][C] :TRANsient :VOLTage :HIGH
This test requires a power source with a voltage range of 180 volts or higher. A
range change will take place if the power source is not set for the high range. The
output voltage will drop temporarily to allow for range change and after 5 seconds
the test will begin.
The output will go to 180 volts for 10 msec and will drop gradually to 115 volts in
81.25 msec. After 5 seconds, a range change will take place to the original setup.
This is a simultaneous test to all selected phases.
2. Transient low voltage test (Figure 7, page 134).
MIL704D[A][B][C] :TRANsient :VOLTage :LOW
The output voltage will drop to 80 volts for 10 msec. It will gradually rise to 115
volts in 81.25 msec. This test is a simultaneous test to all selected phases.
3. Transient voltage test
MIL704D[A][B][C] :TRANsient :VOLTage
This test will combine High voltage transient and Low voltage transient. There
will be a pause of 5 seconds between tests. If the voltage range is below 180
volts, the High voltage transient test will not take place.