Manual
CF-7002_ii_110914.doc     Pg 3 
4
5
  INSTALLING HANDLE 
•  Loosen SETSCREW (15a) from HANDLE (15) 
IMPORTANT: Handle BLADE (15b) shall be aligned with wider 
portion of handle POST (15c)
•  Slide HANDLE (15) down onto and engage valve 
STEM (10a) 
•  Handle POST (15c) shall completely cover lock 
NUT (14) and seat against ESCUTCHEON (13) 
•  Tighten SETSCREW (15a)  and rotate handle 
BLADE (15b) to check operation, open position is 
when BLADE (15b) is rotated forward 
To obtain proper alignment it may be necessary to 
rotate VALVE (10) so that handle BLADE (15b) is 
aligned with SPOUT (1). This may be achieved as 
follows: 
•  Slightly loosen lock NUT (14) 
•  Place HANDLE (15) onto valve STEM (10a) 
•  Rotate VALVE (10) in proper direction to achieve 
proper alignment of handle BLADE (15b) 
•  Remove HANDLE (15) and while firmly holding 
VALVE  (10) in position from underneath securely 
tighten lock NUT (14) 
•  Then reattached HANDLE (15) as mentioned 
above 
  INSTALLING VALVE HOSES 
•  Attach small hose NUT (16a) to spout TEE (9a) 
•  Attach large hose NUT (16b) to valve side 
OUTLET (10b) 
•  Repeat on other side valve 




