Manual

PB-R_ii_110106.doc Pg 3
FINISHED WALL
VALVE (1) shall be located in framed wall so that
FINISHED WALL (9) is FLUSH with surface of
MUDGUARD (4)
The Maximum GAP between FINISHED WALL (9)
and MUDGUARD (4) should be no more than
1
4” to
allow for proper trim coverage
These finished wall requirements are necessary for
proper fit of trim as described in TO-PBL-XX ½
Pressure Balance Trim Installation Instructions
MAINTENANCE
Pressure Balance Cartridge Service
Shut off water supply to pressure balance cartridge
by turning hot & cold SERVICE STOP SCREW (10)
clockwise (inward) until screw stops
Remove CARTRIDGE NUT (11) from BODY (1)
Carefully remove CARTRIDGE (12) from BODY (1)
by holding CARTRIDGE (12) as close to BODY (1)
as possible and wiggle back and forth until
CARTRIDGE (12) comes out
IMPORTANT: To prevent accidental disassembly of cartridge during
removal, place finger and thumb on tabs of CARTRIDGE (12) as shown
To determine if cartridge is functioning properly
shake cartridge from side to side, the internal piston
should make a clicking sound; if no sound perform
the following: Soak cartridge in white vinegar for at
least 8 hours to remove scale and debris; if still no
clicking sound is heard replace cartridge
IMPORTANT: Prior to installing CARTRIDGE (12), apply a thin film
of non-petroleum based grease onto O-RING (13)
Tighten CARTRIDGE NUT (11) to 150 in-lbs
Open hot & cold SERVICE STOP SCREW (10)
counter-clockwise (outward) until screw stops
Reversed COLD and HOT Inlets
Perform above steps to remove CARTRIDGE (12)
from BODY (1), with CARTRIDGE (12) removed
rotate cartridge 180° and slide back into BODY (1)
CAUTION: When inserting CARTRIDGE (12) be certain that top
and bottom pins align into holes on BODY (1)
Check Valve Service
Shut off water supply to valve inlets at main or valve
upstream from BODY (1)
Remove CHECK VALVE (15) from BODY (1)
Rinse CHECK VALVE (15) under running water
Prior to installing CHECK VALVE (15) into BODY
(1), apply a thin film of non-petroleum based
grease onto O-RING (16)
Tighten CHECK VALVE (15) to 150 in-lbs
ø
5” Max.
Diameter
Hot
Inlet
Hot
Inlet
Position of Cartridge
(factory assembled)
Position of Cartridge
for reverse connection
Tab
Tab
Tab
Tab
Tab
Tab