Installation Guide

Questions? (888) 788-2254
www.CaliBamboo.com
Cali Vinyl Flooring Installation Guide
Floating Click-Lock Luxury Vinyl Plus Plank Installation (Pages 3-9)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliBamboo.com
Pre-Installation
P ACE
EXPANSION
GAPS
Vinyl ooring can be used in areas ranging from 32°F to
113°F.
Leave at least 1/4” expansion spaces between ooring and
ALL vertical objects (walls, cabinets, pipes, etc.) Large ooring
runs may require additional expansion space. Use transition
moldings between rooms and doorways 3 feet or less.
Undercut door jambs and casings to provide adequate
expansion space. Do not screw or nail cabinetry or other
permanent xtures to a oating oor.
32-113°F
1/4” Expansion Gap
1/4” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete suboors or Silicon Vapor Shield on plywood.
Use 6mil Plastic on Concrete
PA CE
ACCLIMATE
FLOORING
For Vinyl ooring, lay boxes on the oor and only open box
ends as shown above.
Acclimate your oor as close to the
installation area as possible, for 1 to 2 days in normal
living conditions.
Acclimate Your Vinyl Flooring For 1 to 2 Days
PACE
PREPARE
THE SUBFLOOR
Page 4