Installation Guide
Questions? (888) 788-2254
www.CaliBamboo.com
Cali Vinyl Flooring Installation Guide
Glue Down Luxury Vinyl Plus Plank Installation (Pages 10-15)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliBamboo.com
Pre-Installation
P ACE
EXPANSION
GAPS
Leave at least 1/4” expansion spaces between ooring
and ALL vertical objects (walls, cabinets, pipes, etc.)
Large ooring runs may require additional expansion
space. Transition pieces become optional with
Glue-Down method. Undercut door jambs and casings
to provide adequate expansion space. Cali Bamboo®
does not recommend screwing or nailing cabinetry or
other permanent xtures to ooring.
32-113°F
1/4” Expansion Gap
1/4” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier on concrete suboors or
a vapor barrier on plywood. (Required adhesive will act
as moisture/vapor barrier.)
Required Adhesive will act as Moisture Barrier
Vinyl ooring can be used in areas ranging
from 32°F to 113°F.
PA CE
ACCLIMATE
FLOORING
For Vinyl ooring, lay boxes on the oor and only open
box ends as shown above. Acclimate your oor as close
to the installation area as possible, for 1 to 2 days in
normal living conditions.
Acclimate Your Vinyl Flooring For 1 to 2 Days
PACE
PREPARE
THE SUBFLOOR
Pag e 11










