Installation Guide

Questions? (888) 788-2254
www.CaliBamboo.com
Cali Vinyl Flooring Installation Guide
Glue Down Luxury Vinyl Plus Plank Installation (Pages 10-15)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliBamboo.com
Pre-Installation
P ACE
EXPANSION
GAPS
Leave at least 1/4” expansion spaces between ooring
and ALL vertical objects (walls, cabinets, pipes, etc.)
Large ooring runs may require additional expansion
space. Transition pieces become optional with
Glue-Down method. Undercut door jambs and casings
to provide adequate expansion space. Cali Bamboo®
does not recommend screwing or nailing cabinetry or
other permanent xtures to ooring.
32-113°F
1/4” Expansion Gap
1/4” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier on concrete suboors or
a vapor barrier on plywood. (Required adhesive will act
as moisture/vapor barrier.)
Required Adhesive will act as Moisture Barrier
Vinyl ooring can be used in areas ranging
from 32°F to 113°F.
PA CE
ACCLIMATE
FLOORING
For Vinyl ooring, lay boxes on the oor and only open
box ends as shown above. Acclimate your oor as close
to the installation area as possible, for 1 to 2 days in
normal living conditions.
Acclimate Your Vinyl Flooring For 1 to 2 Days
PACE
PREPARE
THE SUBFLOOR
Pag e 11