TG Installation Guide

Questions? (888) 788-2254
www.CaliBamboo.com
Hardwood Flooring Installation Guide
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliBamboo.com
P
A
C
E
Don’t forget to review Cali Bamboo® Flooring
Installation Guidelines for detailed instructions.
calibamboo.com/bamboo-oor-installation-guide.html
P ACE
EXPANSION
GAPS
As a general rule, the ideal indoor humidity range for
hardwood is 40-60% relative humidity. In some climates
or households, the average humidity range may be
higher or lower. That’s okay! In this case, simply extend
the acclimation period, and maintain humidity levels at
normal living conditions set during acclimation.
See website for Engineered ooring requirements.
Leave at least 1/2” expansion spaces between ooring and ALL
vertical objects (walls, cabinets, pipes, etc.) Large ooring runs
may require additional expansion space. For oating oors, use
transition moldings between rooms and in doorways that are
5ft. or less. Undercut door jambs and casings to provide adequate
expansion space. Do not screw or nail cabinetry or other perma-
nent xtures to a oating oor.
40-60% rH
1/2” Expansion Gap
1/2” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier such as Titebond® 531+
on concrete suboors.
Use Titebond® 531+ On Concrete
PA CE
ACCLIMATE
FLOORING
Cross-stack ooring on a pallet, mixing boards from each
box. Acclimate your oor as close to the installation area
as possible, for at least 5 days in normal living conditions.
More time is necessary in extreme climates.
See website for Engineered ooring requirements.
Acclimate Your Solid Flooring For At Least 5 Days
PACE
PREPARE
THE SUBFLOOR
PREPARE
THE SUBFLOOR
ACCLIMATE
FLOORING
CONTROL
ENVIRONMENT
EXPANSION
GAPS
Solid Flooring
Pre-Installation Checklist
Thank you for choosing Cali Bamboo® ooring!
Now that you have chosen the World’s Hardest
Floors™ we recommend that you P.A.C.E. yourself
and review the following checklist:
Pre-Installation
Page 3