Product Overview
3. Rotate the connecting
pipe 180° relative to its axis.
4.Reassemble the unit shown in
the figure, tightening all union nut
connections completely ensuring
all seals are retained.
5. Reverse the position of
temperature gauges as shown.
6. Move the spacer/insert square
on the right.
Note: you can use the recess
channel in the center of the
insulation for electrical cords.
7.
Reassemble the insulation.
With UPS 15-58 pump the
electronic housing of the pump
must be removed by unscrewing
the four screws indicated
by the arrows and turning the
body 90° counterclockwise and
reinstalling. Without performing
this task, it is not possible to
push the group into the insulation.
The ALPHA 25-55U pump will fit
inside the insulation without any
modifications.
1.
Remove insulation; front and rear shells.
Reversible left-right
The group is assembled at the factory with right side discharge with upward flow, codes 165600A or 165602A, or with left side discharge with upward
flow, codes 165620A or 165612A. If not acceptable, or field installation plans have changed, the position of the direction of flow can be switched. Follow
the instructons below to switch sides as needed:
2. Unscrew the connecting
pipes and shut-off ball
valve/spacer assembly and
remove the pump.