User`s manual
RoofCurb for Small Cabinet
Note A: When uNt mounting screw is used,
retah3er bracket must also be used.
Roof Curb for Large Cabinet
Note A: When unit mounting screw is used,
retainer bracket must also be used.
-->
R/A
\
\
-'-_- Gasket around_
duct
S/A
/\
\
Long
SL pport
Suppolt
insulated
deck pan
Gasket around
outer edge \
\,
iBXC}
C00076
UNiT S_ZE
48GS018o042 48GX024-036
48GS048o060 48GX042-060
NOTES:
1. Roof curb must be set up for unit beh_ginstalled
ODS CATALOG NUMBER
CPRFCURB006A00
CPRFCURB007A00
CPRFCURB008A00
CPRFCURB009A00
A
IN. {NM)
8 (203)
14 (356)
8 (203)
14 (356)
B
IN.(MM)
11(279)
11(279)
16 3/16 (411)
16 3/16 (411)
C
RN.(MM)
161/2 (419)
161/2 (419)
17 3/8 (441)
17 3/8 (441)
D
IN. (t_M)
2G3/4 (730)
28-3/4 (730)
40-1/4 (1022)
40-1/4 (1022)
2. Seal strip must be applied, as required, to unit being installed.
3. Dimensions in ( ) are in millimeters
4. Roof curb is made of 16-gage steel.
5. Table lists only the dimensions, per part number, that have changed
6. Attach ductwork to curb (flanges of duct rest on curb)
7. InsuIated panels: 1-in. thick fiberglass 1 Ib density.
8. Dimensions are in inches
9. When unit mounting screw is used (see Note A), a retainer bracket must be used as well This bracket must also be used when required by code for hurricane or
seismic conditions. This bracket is available through Micrometl.
Fig. 4--Roof Curb Dimensions
GROL ND MOL_T
The unit may be installed either on a slab or placed directly on the
ground if local codes permit. Place the unit on level ground
prepared with gravel _br condensate discharge.
Step 3--FIELD FABRICATI= DUCTWORK
Secure all ducts to roof curb and building strecture on vertical
discharge uriits Do t_nt connect duct_oHc to z_nit. For horizontal
applications, unit is provided with flanges on d_e horizontal
openings Installation of flexible duct connector is recommended
to prevent tlansmission of vibration and/or noise to stl_acture. All
ductwork should be secured to the flanges. Insulate and weather°
proof all external ductwork, joints, and roof openings with counter
flashing and mastic in accordance with applicable codes
Ducts passing through an unconditioned space must be insulated
and covered with a vapor barrier.










