TDS
FOR WARRANTY ISSUES OR QUESTIONS, CONTACT CAHABA AT (205) 702-9101.
© 2021 CAHABA. ALL RIGHTS RESERVED.
3
PEARL 69 IN. FREESTANDING ACRYLIC TUB
Installation Instructions
SWAPPING OUT LEGS
1. Place the tub upside down on a throw rug or other
protected surface.
2. Uninstall the pre-installed legs by unscrewing the
nuts and removing the leg from the tub assembly
(Diagram A).
3. Screw the two leg screws into the new leg (Diagram
B).
4. In order to yield a tight t between the leg and the
bathtub body, adding washers to control the gap is
required. Two sizes of washers are provided.
Start by using the 25mm washers and if you nd that
they overlap, then use the 20mm washers. You may
need 2 to 3 washers for the top screw, whereas 1 to
2 washers might be required for the bottom screw
(Diagram C).
It is recommended that you start by simply putting
back the same amount of washers that were there
before you uninstalled the original leg.
5. Slide the leg into the metal bracket, tting the screws
into the bracket’s hole (Diagram D).
6. Move the leg up and down slightly to nd its nal
resting position, where the gap between the leg and
bathtub body is the smallest possible (Diagram E).
Once the position is found, make sure that the
washers of the top and bottom screws ll the gap
behind the bracket. If more washers are needed, add
them now.
7. Very loosely mount one washer and one nut on each
screw (Diagram F).
8. Start by tightening the BOTTOM screw. Once done,
tighten the top screw with medium strength (Diagram
G).
NOTE: The legs do not bear the weight of the product NOTE: The legs do not bear the weight of the product
and serve a decorative function only.and serve a decorative function only.
A B
2 ~ 3
1 ~ 2
C
D
E
F
#1
#2
G