Installation Guide

2 31-2000880 Rev. 1
HOOD COMPONENTS
A-RangeHood
B-DuctCoverBrackets(3)
C-Screws2.9x6PZ1(10)
D-LowerDuctCover(1)
E-UpperDuctCover(1)
F-RecirculationDuct(1)
G-WallAnchors(2)
H-WallBracket(1)
I-Screws4.2x44PZ1(2)
J -Screw3.1x9.5P013(4)
INSTALLATION OF DUCT COVER KIT
1. Finish hood installation as per the hood install
instructions.
2. Follow steps below if installing in vented mode.
I. Placewallbracket(H)againstthebackwallso
thatthetopedgeis1/16”fromtheceilingand
level.Alignthecenterofthebracketwiththe
center line of the hood and mark bracket holes.
Usetheoutermostbracketholes.Remove
the bracket and drill 2 clearance holes for
wallanchorswith1/16”drillbit.Installthewall
anchors(G)andsecurethebrackettothewall
usingscrews(I).
II. Installthe3ductcoverbrackets(B)intothe
slots located on top of the hood shown in the
image below. Secure them to the hood using
screws(C).
III.Securetheupperductcover(E)tothe
wallbracketusingscrews(J).Forvented
installations, the duct cover holes can be hidden
by flipping the duct cover upside down. Refer to
the installation height tables to verify available
ceiling heights.
Installation
D
E
F
H
A
G
I
C
B
J
C
L
1/16"
Ceiling