Use and Care Manual
49-2000061  Rev. 2 17
INSTALLATION INSTRUCTIONS
Installation Instructions
5
 INSTALL CEILING BRACKET
The ceiling bracket must be installed when the duct 
cover is used to span 24” or more height above 
the hood. The bracket will hold the decorative duct 
cover in place at the top.
NOTE: The ceiling bracket is not required when 
using only the 12” section of the duct cover.
•  Install the 2 small screws into the sides of the 
duct bracket. Remove the screws. Pre-tapping the 
holes will insure ease of final installation.
•  Match center notch on the bracket to the 
centerline on the wall and flush against the ceiling.
•  Mark the 2 screw hole locations.
•  Drill 2/8” pilot holes in marked bracket location.
•  If pilot holes do not enter studs, enlarge the holes 
to 3/8” and install wall fastener anchors.
•  Secure the bracket to the rear wall with wood 
screws and washers. Use wall anchors if needed.
NOTE: Bracket has 2 sets of holes. Use larger holes 
for wall fasteners or wood screws with washers. Use 
smaller holes for wood screws with washers.
6
 CONNECT DUCTWORK
•  Push duct over the end of the transition until it 
reaches the stop tabs.
•  Install ductwork, making connections in direction 
of airflow as illustrated.
•  Secure joints in ductwork with sheet metal screws.
•  Wrap all duct joints with duct tape for an airtight 
seal.
•  Use duct tape to seal the flange connection
CAUTION
 Do not use sheet metal screws at 
the transition to ductwork connection. Doing se will 
prevent proper damper operations. Seal connection 
with tape only.
Install Ceiling 
Bracket When 
Duct Cover is 
Used to Span 
24” or more
See Step 
9 to Install 
Duct Cover.
Duct Stops
Duct Tape Over 
Seam and Screw
Duct Tape 
Only for Proper 
Operation of 
Damper
Duct Tape Over Flange
Air Flow
House 
Ductwork
Transition
Ductwork
Screw










