Use and Care Manual
12 49-2000061  Rev. 2
Installation Preparation
TOOLS AND MATERIALS REQUIRED 
(NOT SUPPLIED)
Additional Materials:
•  120V 60Hz, 15 or 20 Amp, 2 wire with ground. 
Properly grounded branch circuit.
•  Strain relief for junction box.
•  7” round metal duct or 3-1/4” x 12” rectangular 
duct length to suit installation.
REMOVE THE PACKAGING
•  Remove the small box housing the motor.
•  Lift the hood out of the box.
•  Remove shipping screws holding the wood 
mounting piece to the back side of the hood. Set 
aside wood mounting piece and screws for later 
installation. Do not discard.
•  Remove the “V” shaped carton insert.
•  Remove parts package from the “V” shaped 
cardboard insert.
•   Remove junction box cover and knockout.
•   Install strain relief onto back or top of hood.
•   Remove all tape and packing material from the 
hood, duct transition and motor.
INSTALLATION PREPARATION
Pliers
Wire Cutter/Stripper
Tin Snips
Allen Wrench
Spirit level
Duct tape
Safety glasses
Ladder
Saber saw or Key Hole Saw
Phillips and Flat blade 
screwdrivers
1/4” pivoting hex socket
Hammer
Electric drill with 1/8” and 3/8” bits
Flashlight
UL Listed Wire nuts
Pencil and tape 
measure
Wood 
Mounting 
Support
Hood
Parts 
Package
Shipping Carton
Motor










