Installation Instructions
Standard Installation Preparation
6
PREPARE THE OPENING (CONT.)
Installation over a GE Appliances/
Monogram Oven and Warming Drawer:
NOTE: Additional clearances between the 
cutouts may be required. Check to be sure 
the oven supports above the Warming Drawer 
location does not obstruct the required interior 
depth and height. See Warming Drawer 
installation instructions for details.
CAUTION
 For personal safety, the 
mounting surface must be capable of supporting 
the cabinet load, in addition to the added weight 
of the oven and drawer, plus additional oven 
loads.
PREPARE THE OPENING (CONT.)
Installation over a GE Applainces/
Monogram Oven:
* If you are replacing a GE Appliances/
Monogram electric double oven with the 
combined installation of an Advantium/
Convection 120 and a single oven, use the 
dimensions shown. The middle rail separating 
the two openings may need to be larger than 
the 2” minimum shown.
Construct  
solid bottom - 
Min. 3/8” plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
Per Oven 
Requirement
45-1/4”
2” Min.
(3” Recommended)
Per Warming 
Drawer 
Requirement
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
45-1/4”
Min.
Construct  
solid bottom 
- Min. 3/8” 
plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
Per Oven 
Requirement
 IMPORTANT: Always maintain 36-3/4” minimum height from the floor to the cutout in any single or 
combined installation unless plastic trim is installed.










