Installation Instructions
5
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over a GE Appliances/
Monogram Warming Drawer:
NOTE: Additional clearances between the cutouts 
may be required. Check to be sure the oven 
supports above the Warming Drawer location does 
not obstruct the required interior depth and height. 
See Warming Drawer installation instructions for 
details.
30”
23-1/2”
25-1/4”
17-1/2”
36-3/4”
Min.
2” Min.
(3” Recommended)
Per Warming 
Drawer 
Requirement
Construct  
solid bottom 
- Min. 3/8” 
plywood 
supported  
on all four 
sides. Must be 
able to support 
weight of oven 
and contents.
PREPARE THE OPENING
The Advantium/Convection 120 can be installed 
in combination with other GE Appliances/
Monogram appliances. Always follow each 
product’s Installation Instructions to complete the 
installation.
Single Advantium/Convection 120 
Installation:
Order a 30” wide single oven cabinet or cut the 
opening in a wall to the dimensions shown.
• 
 Allow 1-1/4” case trim overlap 
at the top and 7/8” overlap on the bottom and 
2-1/4” overlap for each side of the opening.
• 
 Oven overlaps will conceal cut edges on all 
sides of the opening. 
 When installed over a single oven or a 
warming drawer, allow at least 2” between 
the two openings. This separation will provide 
clearance for bottom overlap of the Advantium/
Convection 120 and the other appliance 
overlaps.
• 
 The support must be level and rigidly mounted, 
flush with the bottom edge of the cutout.
30”
23-1/2”
25-1/4”
17-1/2”
Construct  
solid bottom 
- Min. 3/8” 
plywood 
supported  
on all four 
sides. Must 
be able to 
support 
weight of 
oven and 
contents.
36-3/4”
Min.
 IMPORTANT: Always maintain 36-3/4” minimum height from the floor to the cutout in any single or 
combined installation unless plastic trim is installed.










