Installation Instructions
6 31-2000356 Rev. 1
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over a Wall Oven and 
Warming Drawer:
Construct 
Solid Bottom 
Min. 3/8” 
Plywood 
Supported 
by 
2x4 or 2x2 
Runners all 
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven 
Requirement
45-1/4” 
Min.
Per warming drawer requirement
2” Min. 
(3” recommended)
NOTE: Additional clearances between the cutouts 
may be required. Check to be sure the oven supports 
above the Warming Drawer location do not obstruct 
the required interior depth and height. See Warming 
Drawer installation instructions for details.
CAUTION
For personal safety, the mounting 
surface must be capable of supporting the cabinet 
load, in addition to the added weight of the oven and 
drawer, plus additional oven loads.
PREPARE THE OPENING (CONT.)
Installation over a Wall Oven:
30”
23-1/2”
25-1/4”
17-1/2”
2” Min. 
(3” recommended)
45-1/4”
Min.
Construct 
Solid Bottom 
Min. 3/8” 
Plywood 
Supported by  
2x4 or 2x2 
Runners all 
Four Sides
Per Oven 
Requirement
• If you are replacing an electric double oven with the 
combined installation of an Advantium 240V and a 
single oven, use the dimensions shown. The middle 
rail separating the two openings may need to be 
larger than the 2” minimum shown.
 IMPORTANT: Always maintain 36-3/4” minimum height from the floor to the cutout in any single or combined 
installation.










