Installation Instructions
7
Standard Installation Preparation
PREPARE THE OPENING (cont.)
Installation under a GE Appliances/
Monogram Microwave Oven and over a 
Warming Drawer:
NOTE: Additional clearances between the 
cutouts may be required. Check to be sure 
the oven supports above the Warming Drawer 
location do not obstruct the required interior 
depth and height. See Warming Drawer 
installation instructions for details.
CAUTION
 For personal safety, the 
mounting surface must be capable of supporting 
the cabinet load, in addition to the added weight 
of the oven and drawer, plus additional oven 
loads.
PREPARE THE OPENING (cont.)
Installation over another GE Appliances/
Monogram Built-In SpeedCook Oven:
• 
If you are mounting a GE Appliances 
Appliances/Monogram Built-In 
SpeedCook 
Oven over another, use the dimensions 
shown. 
The middle rail separating the two openings 
may need to be larger than the 2Ǝ minimum 
shown.
30Ǝ
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
2Ǝ Min. 
(3Ǝ Recommended)
17-1/2Ǝ
Construct  
solid bottom - Min. 
3/8” plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
30Ǝ
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
2Ǝ Min. 
(3Ǝ Recommended)
Per Microwave 
Oven Requirement
3.5Ǝ Min. 
(4.5Ǝ Recommended)
Per Warming  
Drawer 
Requirement
Construct  
solid bottom - Min. 
3/8” plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
 IMPORTANT: Always maintain 36-3/4” minimum height from the floor to the cutout in any single or 
combined installation unless plastic trim is installed.










