Installation Guide
Pipe connection
I.Please drill the holes on the wall for the main body embedded part,
hot and cold water inlet pipes as well as shower arm connection
pipes according to the basic product dimension drawing as below.
2.Please make hot and cold water inlet pipe, the mixed water outlet
pipe connect with control valve, and tighted with the wrench.
Water testing and sealing testing
l.After the pipe connection is completed, open the protective panel
and cover, and the open the cartridge, flush the pipeline; Then close
the cartridge to check the pressure resistance and sealing performance
of the pipeline, make sure there are no leakage.
Testing Purpose: Flush the impurities and sludge in the pipeline to avoid
clogging and affect the effluent functions.
Head shower
Cold water
Hot water
Technical drawing of drilling size
1. The size of the embedded box that needs to be drilled is 5.3" • 6.7"
134mm
5.3INCH
170mm
6.7INCH
130mm
5.12INCH
2.The depth of the embedded box is 2.36 • - 3.15"
It's better to drill the depth of 2.36"for blank wall
mixer water
Hot
water
cold
water
mixer water
Min.60mm
2.36INCH
Max.80mm
3.15INCH
wall
Tile surface
Head shower