Installation Guide
connections connecting to the required functional outlets.
6
2. Re-install the plastic protection cover to the valve.
P
las
t
i
c
ed
ge
ab
ov
e the
t
i
les
Wall
Tiles
7
10、Shower sets installation
11、Handle shower installation
12、Cleaning & Maintenance
To keep the product clean& shining, follow the steps as follows:
1.Flush with clean water & dry with soft cloth only;
2.If any dirt, clean with soft liquid or transparent glass
detergent.
3.Do not use any scrubbing detergent, polisher, sand -cloth,
paper tissue or scraper.
4.Do not use acid detergent, insoluble & grain-like detergent
or soap.
13、Important notice
1.Users under age 14 must be accompanied by an adult otherwise
young users may be scalded by hot water.
After connecting all pipes, please dis-assembling the
plastic protection cover , and switch on/off the cartridge ,
check all connections without any leakage, and all
1.Use a parallel ruler to make sure the wall and valve
being parallel.
2.Use a knife to cut the rest of plastic edge above the tiles.
1.Take off the plastic protection cover.
2.Put the cover board on the valve and tight the handle firmly.
9
10
8、Wall tiling program
7、Water test and leak detection 9、Cover and handle installation
2.All users need to be careful when you turn cold water to hot
water.
8
11
1.
Support Email: frobor@outlook.com