9.7 Complete Start Up Procedure
1. 
Reset control parameters to operating settings if 
adjusted to allow startup and operation test.
2.  Follow instructions TO TURN OFF GAS TO APPLIANCE  
(page 42) if boiler is not being placed into 
immediate operation.
3.  Enter installer information on Warranty Registration 
Card.
4.  Gather all instructions, manuals, wiring diagrams, 
warranty registration card and other supporting 
information. Review with user and/or afx in 
conspicuous location adjacent to boiler.
FIGURE 
9-8 Control Module J7 Connector
J7 CONNECTOR
9 - START UP PROCEDURE